From:                              route@monster.com

Sent:                               Friday, April 15, 2016 10:19 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: CS UT

 

This resume has been forwarded to you at the request of Monster User xapeix03

Lorenzo Quintillano 

Last updated:  03/13/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Las Vegas, NV  89139
US

lquintillano@yahoo.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: LORENZO QUINTILLANO_01172015

Resume Value: 8esj7xi9xu8j3ign   

  

 

LORENZO A. QUINTILLANO

email address: lquintillano@yahoo.com

Mobile Phone No. : 714-588-7917

Home Address:  6436 Jade Mountain Court

                 Las Vegas, NV  89139

 

 

SUMMARY OF TECHNICAL SKILLS

·  Installed & Integrated Ericsson RBS 2000 & RBS 3000 family

·  Installed & commissioned Nokia 2G/3G/4G

·  Installed & re-configured Nokia Ultrasite (2G)

·  Installed & commissioned  router for AT&T ETTCS project

·  Civil works on T1/Fiber Optic path from LEC point to end-user facility

·  Include running DS3 cables & termination of CAT 5 / CAT6 /  25 pairs cables to 66 block/110

·  RF line Sweep Testing using Anritsu RL/DTF

·  OTDR Fiber Scoping  and Testing using  Exfo  and ODM equipment

·  Decommissions Ericsson/Nokia Ultrasite cabinet,

·  MCPA harvest

 

 

 

 

 

TECHNICAL EXPERIENCE

 

MYCOM-North America                        

July 18 2011 to January 16 2015

 

 

T-MOBILE/NOKIA Equipment - SPRINT/SAMSUNG  2.5 Add Project

 

    

·  Close Out Packages for Nokia/T-Mobile use of Excel spreadsheet, pdf, word, power point etc

·  Work on sites punchlists

·  Installation of ESMB, FSME, FSMF, FXFB,   2G/3G/LTE- NOKIA for T-Mobile Modernization RA700

·  Nokia Ultrasite 2G Cabinet Re-groom

·  RF line Sweep Testing using Anritsu

·  Site survey/Audit/ QA/.QC

·  Install NOKIA UMTS  cabinet

·  Nokia Ultrasite T1 harvest & 2G Cabinet re-groom

·  OTDR Fiber Scoping  and Testing using  Exfo  and ODM equiptment

·  ETTCS Project for AT&T Desert Southwest/ Rocky Mountain Region & Pacific Northwest- Infrastructure work for Fiber Optic Delivery to cell site

·  7705 router Installation & ACAT  programming

·  Site survey/walk for ETTCS

·  T1 L2  testing using T-BERD for T1 expansion

·  Install URC SIAD for 3G T1 expansion

 

 

 

 

 

 

 

 

DATALOGIX TEXAS   AT&T PNW NORTH TEXAS

                                   

November 2009 to May 2011

 

 

·  Pre cabling  Include running DS3 cables &  termination of CAT 5 / CAT6 /  25 pairs cables

·  T1 L2  testing using T-BERD for T1 expansion

·  Install URC SIAD for 3G T1 expansion

·  Install/ Integrate RBS 3418/3518 for UMTS 3rd /4th  Carrier add 

·  Tiger Team for alarm clearing

 

 

ORIN USA

September 2008 to August 2009

 

T-Mobile Southern Calfornia/ AT&T Oklahoma and Arkansas

 

·  Installation/ Integration of  RBS 3106, 3206, 2206, 2106

·  RBS 3106 cabinet re-groom

·  Installation of PBC6500, PBC 02 and RRU

·  Installation and troubleshooting of LMU

·  Conducted QA of the cabinets installed

·  Performed T1 testing

·  Site Survey for UMTS PH2 project

·  Determined the point of feed for power supply

·  Documented  and  photographed the survey conducted

·  Verified location of UMTS Cabinet based on plan

·  Make Recommendation based on the survey conducted

 

 

·  Installation/ Commisioning of  3106, 2206, 2106, and 3206

·  Conducted QA of the cabinets installed.

·  Performed T1 testing

 

 

 

 

DATALOGIX TEXAS                   

September 2007 to August 15, 2008

 

AT&T  Los Angeles -  UVERSE Project

 

·  Conducted Field Survey for power supply  to Fiber Cabinet

·  Determined the point of feed for power supply

·  Documented  and  photographed the survey conducted

·  Make proposal for the location of Fiber Cabinet

·  Verify location of Fiber Cabinet based on plan

·  When issues arise,  present alternative solution

 

 

TRAININGS & CERTIFICATION

·              LTE RBS 6000 Installation and Integration

·              RT-2 Certified

Administered by: Ray Laws

PARSONS Sr. Quality Auditor &, Certification Administrator

·              OSHA CAL /OSHA 10

·              AT&T Ask Yourself- April 18, 2013

·              AT&T Methods of Procedures- June 2, 2013

·              AT&T SUPPLIERS AWARENESS-July 23, 2013

 

 

ON THE JOB TRAINING

 

July 2, 2007 to July 27,  2007 

VERSACOM OSP / AutoCAD / F2 Conditioning Training

·              F2 conditioning Design and Work Order preparations which include cost estimations, detailed drawings and associated forms to be approved in the reconstruction of existing copper distribution plants.

·              Outside Plant Engineering of Fiber/Copper OSP projects including new subdivision layout, Rehabilitation and relocation of cable facilities.

·              Design and Revisions of Work Order permits for outside plant facilities, conduit systems, buried and aerial facilities for both copper and fiber.

·              Maintain documentation and drawings in AutoCAD.

·              Conduct field measurements for cable and bore details, hand holes, and access cabinet details.

·              Makes sound engineering judgment in the field concerning cable footages, terminal and hand holes placements, etc.

·              Interprets and designs outside plant plans and records from draft form.

·              Right of Way/Easement documentation knowledge.

·              Perform site surveys. Develop material lists, cable running lists and detailed installer instructions.

 

Ericsson UMTS CD Instruction

      Completed August 30, 2006

July 20, 2006 to August 9, 2006

            AT&T Chicago, IL GSM EXPANSION

·              Installation of RBS 2206 cabinets (from base frame up to the main cabinet)

·              Assisted in the installation of RBS 2106 including BBU and interconnection of batteries

·              Installation of T1 cables from the NIU to the RBS, including dressing of cables to the ladder rack and termination with RJ45 connectors

·              Termination of power cables to RBS 2206 and RBS 2106      

 

 

COMPUTER SKILLS

 

 

·Microsoft Excel - Basic (extensive)

·Microsoft Word

·Intermediate Microsoft Power Point

·Microsoft Outlook

·Dropbox

 

 

REFERENCES;

 

 

David Roscher, PMP

Project Manager

MYCOM-NORTH  AMERICA  PNW

15340 NE 92nd St. BLDG D

Redmond, WA 98052

714 6515996 (MP)

 

Abelardo Muyco III

Project Manager

Datalogix-texas, Houston TX    

Cell (214) 717 9036

www.datalogixtexas.com

 



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

2+ to 5 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-NV-Las Vegas

Relocate:

No

Willingness to travel:

Up to 50% travel

 

Languages:

Languages

Proficiency Level

English

Advanced

Tagalog

Fluent